What is the process ?
1. Work with a Golden State Steel Buildings
representative to design a building tosuit your needs.
2. The design is sent to engineering
for approval.
3. Apply for a permit to build your
building. (Permit regulations vary by County and State.
Start investigating the requirements in your area as
soon as you have decided to add a building to your property.)
4. Make arrangements to have the building
erected.
5. Plans return from engineering with
stamp and your distributor representative orders your
building.
6. Building is delivered to your site.
How long does the process take?
1. Engineering Package—7 to 10
working days.
2. Permit approval—two to three
weeks.
(Check with your local building department for lead
times in your area to get permit approval.)
3. Building Delivery–2 to 3
weeks.
Are there other things I need to think about?
1. Snow loading, wind speed, exposure,
soil density variances, etc.
2. Aesthetics >>Windows >>Trim
>>Siding Choices
What clearances are needed for the door selected?
1. For overhead doors you need 18”
additional height for door track and 3” on each
side for the side door track.
(What are you putting in the building? If your boat
and trailer have a combined height of 10 feet, you need
to plan on a building with 12 foot doors)
2. Consider a canister door to save
space.
|